Industrial and technical environments require a clear definition of operating conditions. Temperature, ventilation, contaminants and continuity must be analysed in relation to the activity.
Every industrial process has its own limits in terms of temperature, humidity and contaminants – that’s where we start.

The project begins with the activity and its operational constraints. AIRQIA helps to translate requirements into verifiable selection criteria.
Technical space, access, extraction and control are key factors in determining the solution. Coordination with other disciplines helps to avoid conflicts both on site and during operation.
The delivery must include operational and support criteria. An industrial solution must be understandable to those who operate and maintain it.
Explore the solution and find out how it applies to your project.
Industrial and technical HVAC starts from a simple question: what conditions does the activity require? Temperature, humidity, airborne contaminants and operating hours vary widely between a production line, a technical warehouse and an equipment room. There is no single climate for a factory, and a solution is only reliable if it is defined from the operating limits of each process. This is why the brief matters more than any catalogue.
Turning requirements into verifiable selection criteria is the first step. Once it is clear which temperature deviations are acceptable, for how long and with what consequences, it becomes possible to compare alternatives objectively, discuss redundancy and plan maintenance. Without that basis, the risk is choosing equipment that is oversized or, worse, undersized at the moments of peak load. It also gives suppliers and installers a shared target.
In technical environments, ventilation and extraction shape the solution as much as the cooling equipment itself. Available space, maintenance access and coordination with other disciplines avoid clashes on site. When the process produces heat, dust or fumes, ventilation should be studied together with cooling, not treated as an accessory. Early coordination of ducts, pipework and access routes saves time during installation.
Delivering industrial and technical HVAC should include commissioning, documentation and a maintenance plan, so the operating team understands and maintains it. Where refrigerants are involved, the European Commission publishes information on fluorinated gases. For cases that need design support, see engineering and specifications or present the challenge to the AIRQIA team. That keeps responsibilities clear after handover.
Tell us about the background, the objectives and the deadline. The AIRQIA team will help you determine the most appropriate technical approach.
Utilizamos cookies necessários para o funcionamento do site. Com a sua escolha, podemos também usar cookies opcionais para compreender a utilização e melhorar a experiência. Pode aceitar, rejeitar ou personalizar as preferências.
Escolha as categorias opcionais. Pode alterar esta decisão a qualquer momento.
Permitem o funcionamento básico, a segurança e a memorização das preferências de cookies.
Permitem recordar dados de identificação quando deixa um comentário, se esta funcionalidade for utilizada.
Ajudam a compreender a utilização do website e a melhorar conteúdos e navegação, quando autoriza esta categoria.
Mede a utilização do website para ajudar a melhorar conteúdos e navegação. A recolha de dados de análise depende das suas preferências de cookies.
Serviço: policies.google.com (opens in a new window)
Consulte a nossa Política de Cookies e a Privacy Policy.